Dry the slab before you prepare the concrete for hardwood flooring it must be dry.
Putting down wood floor on concrete.
You can attach it directly to the concrete or install a subfloor first and then attach the floor to that.
Follow these steps.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
First position the plywood layer with its edges parallel to the wall.
Despite a successful moisture check and the presence of an underground moisture barrier you still.
Experienced professionals pay close attention to managing moisture and minimizing wood floor expansion and contraction when preparing to install hardwood floors on concrete slabs.
Installing a hardwood floor over a concrete slab even if your home was built on a concrete slab you can still enjoy the beauty and charm of hardwood floors.
Add moisture barrier once the slab is dry cover it with a moisture barrier consisting of two layers of tar.
Treated plywood to the concrete with concrete screws spaced every 16 in.
How to put a wood floor on concrete moisture check.
Tap 1 4 inch shims in between the edges of the floor and the wall to leave room for expansion image 3.
Plywood panels should be set down with 1 8 inch gaps between sheets.
Builders typically lay down a vapor barrier before they pour a concrete slab.
The most straightforward method is not to attach it but float the floor on top.
Concrete tends to wick.
Things you ll need step 1.
Do not fasten and leave 3 4 of an inch of space between the wall and plywood.
There are three ways to lay a floor over concrete.
You usually determine this.
Place the second layer perpendicular or at a 45 degree angle to the first layer.
How to install hardwood over concrete 3 methods.